It was a long time coming, but in 2017 Camberwell Hockey Club finally began work on its clubhouse redevelopment. After battling through planning approvals and years of red tape, the old weatherboard pavilion — home since 1939 — was demolished to make way for something built for the club’s future rather than its past.
Not Just a Fresh Coat of Paint
As Victoria’s largest hockey club, and still growing, Camberwell had long outgrown its old pavilion — a building barely capable of supporting a quarter of the membership by 2017. In partnership with the City of Boroondara and builders Ireland Brown Constructions, the club set out to build something worthy of its next era: a new gymnasium, AV and match-review equipment, a dedicated physiotherapy space, and state-of-the-art recovery facilities including a spa and ice bath, alongside the standard clubrooms Council’s build provided.

Demolition to Opening: The Build
Demolition Begins — June 2017
In the depths of winter, mid-season, demolition began on the old Matlock Reserve pavilion. For eleven months the whole club operated out of portables wedged between the pitch and the street fence, with car parking chaos and a construction generator testing the patience of both players and neighbours.
Structure Begins to Emerge — September 2017
A few months in, with the club settled into its temporary portables, foundations were finally poured and the new building’s frame began to rise out of the ground.

First Floor Emerges — January 2018
Back on site after the Christmas break, Ireland Brown poured the first-floor slab and raised the steel roof frame — the first real sense of the building’s scale.
Interior Work Begins — March 2018
With the elevator installed and the first-floor plan taking shape, the view from the new decking — later to become one of the building’s best features — started to become real.
Project Approaches Completion — June 2018
A year on, the club began preparing for the move: training staff on the new canteen and bar, organising the network and AV infrastructure, and getting ready to farewell “the village” of portables.
Camberwell Settles In — August 2018
The Matlock Centre was officially opened by the City of Boroondara in August 2018, and the club quickly settled into its new home — hosting events, perfecting match-day routines, and putting the new gym and recovery spaces to work.
Funding the Vision
The project was a genuine partnership. Beyond Council’s standard build, members raised more than $205,000 through the Australian Sports Foundation to fund the gymnasium, recovery room and office — and the club contributed over $280,000 to the project all told.
$50K
Raised — demolition
$120K
Raised — structure
$180K
Raised — first floor
$205K+
Raised — opening
See the Finished Facilities
Take a look at what the redevelopment built — clubrooms, gym, recovery and function spaces at the heart of Matlock Reserve.
Back to Facilities →Topics: matlock-centre, redevelopment, clubhouse, history, facilities